Technical services can be reached monday to friday 8 00 a m.
Mannington vinyl flooring installation instructions.
Anyone installing mannington products is urged to follow all directions and advice in the installation guidelines.
Anyone installing mannington products is urged to follow all directions and advice in the installation guidelines.
Mannington flooring adhesive jobsite and subfloor must be acclimated to a stable condition before installation see job site testing.
Prior to and during installation.
Contact mannington technical services for guidance about subfloor testing and installation recommendations.
Apply the adhesive with a 1 16 wide 1 32 deep 1 32 apart notched trowel and then roll the adhesive ridges smooth with a pre soaked 3 8 nap roller.
Always follow all safety guidelines when installing any flooring product to protect yourself and others.
Never install mannington flooring products over residual asphalt type cutback adhesive as bleed through may occur.
We have based all our instructions on industry accepted recommendations as well as results gained from regular field testing.
Anyone installing mannington products is urged to follow all directions and advice in the installation guidelines.
Temperature of the room should not go below 55 f after 48 hours after installation and anytime thereafter.
Acclimate flooring and the room at a constant temperature between 65 f and 85 f for 48 hrs.
We have based all our instructions on industry accepted recommendations as well as results gained from regular field testing.
Luxury vinyl sheet installation information mannington strongly recommends using trained professional installers for the best long term performance of any of our flooring products.
Mannington strongly recommends using trained professional installers for the best long term performance of any of our flooring products.
Mannington flooring adhesive jobsite and subfloor must be acclimated to a stable condition before installation following.
Mannington flooring is not suitable for external installation or unheated locations.
Point loads and rolling traffic for 48 hours and should utilize minimal wet cleaning for 5 days except locksolid.
These instructions cover all fully adhered installations of mannington commercial luxury vinyl floors lvf this includes.
Instructions and recommendations must be followed for a satisfactory installation.
Mannington commercial v 95 two part epoxy adhesive is used with mannington commercial lvt over non porous substrates or where high performance adhesive is required.
Following installation mannington lvf foot traffic should be minimized for 24 hours.
Anyone installing mannington products is urged to follow all directions and advice in the installation guidelines.